DESCRIPTION
- CPM of the Interior Module type (Cubas with individual cable glands for each conductor and sealable transparent covers) forinstallation inside a niche or construction site with door accessible directly from the ground.
- Three-phase connection with Neutral sectioning and protection by BUCs Size "00" for connections up to 160 A (50
- Connection point for Neutral Earthing (Maximum admissible section 50 mm²).
- Maximum admissible section of cables Connection 240 mm².
- Panels for installation of 4 ITs (3 Phases + 1 Neutral) ITs not included.
- Test Block (12 elements) + Triangle for indirect three-phase meter mounting + Modem space.
- Omnipolar Individual Maneuver Switch: 160A.- Palleas connection Individual Derivation (3 phases + neutral), with output from its drivers from the bottom or top.