CPM with door (with triple-action latch and lock operated from handle with bolt for padlock) and canopy (with ventilation and anti-mosquito grid) for installation directly on the outside (recessed, semi-recessed or on base) accessible directly from the ground. Entrance of all drivers by diaphanous space in the lower part.
- Three-phase connection with Neutral sectioning and protection by BUCs: Size "2" for connections up to 400 A (100 < P ≤ 250 kW)
- Connection point for Neutral Earthing (Maximum admissible section 50 mm2).
- Maximum admissible section of cables Connection 240 mm2.
- Pletinas for installation of 4 ITs (3 Phases + 1 Neutral), ITs not included.
- Test Block (12 elements) + Triangle for indirect three-phase meter mounting + Modem space.
- Omnipolar Individual Maneuver Switch: 400A.
- Palleas connection Individual Derivation (3 phases + neutral), with its drivers coming out from the bottom.